Home >Products >Outdoor Playground Equipment >Feiyou outdoor playground equipment FY-13803
Feiyou outdoor playground equipment FY-13803

Feiyou outdoor playground equipment FY-13803

Contact: Tony Zhang

Tel: +86-577-85951908

Fax: +86-577-86457291

E-Mail: [email protected]

Product Description


Name

Feiyou outdoor playground equipment

Model

Plastic Climber(FY-13803)

Size (L*W*H)

305*305*154CM

Material

Plastic: The plastic part is made up of LDPE (Linear low density polyethylene)

Iron parts: All metal pipes is made of Galvanized Pipes conforming to GB/T 13793-2008 with thickness of 2mm.

Installation

Professional CAD instruction or arrange professional staff install.

Certificate

ISO9001: 2000, CE, TUV, SGS etc.

Age range

3-12 years.

Usage

Pre-school, amusement park, shopping mall, public places etc.

Delivery time

7 days per 1*40HQ

FAQ

1.What services does Feiyou offer?

1. Feiyou have experienced sales team to offer the pre-sale and after sale service in 24 hours.

2. Feiyou have the professional design team to provide the customized design based on your area.

3. Feiyou have the excellent team for installation.

2. What about the trade term, payment term and delivery time?

Trade terms: EXW, FOB, CFR, CIF, DDU, DDP.

Payment terms:

T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.

For order more than 50,000.00$, we accept L/C.

For trial orders, we accept western union, paypal or cash.

Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP. 

3.How can I place order? 

Sign contract-- Pay deposit-- Production--Pay deposit--loading – delivery.

4.What about the Installation?

We can provide our professional installation team for assembling the playground in your area, you will be in charge for all the costs for the team. 

5.How long does it take to get a plan or design?

It depends on the size of your playground. It takes 1-2 days to complete an overall design.

6.Where is your factory located? 

We’re located in Wenzhou, Zhejiang, China.

It will take 1 hour from Shanghai to Wenzhou by flight.

It will take 2 hours from Guangzhou to Wenzhou by flight. 


Inquiry
Services

+8613587421435

#16 Chuangqiang Road, Light industrial area, Lucheng district, Wenzhou city, Zhejiang Province, China.

+86-577-85951908

+86-577-86457291

[email protected]

Copyright © 2018 Zhejiang Feiyou Kangti Facilities Co.,Ltd. All rights reserved.  Powerby:Injnet  浙ICP备12030220号-1  sitemap.xml sitemap